MaxPERF Drilling Tool Testimonials
MaxPERF Drilling Tool®
formerly known as PeneDRILL® {Testimonials}

SEARCH BY KEYWORD  
Your search returned 6 results. Now showing 1 to 6
 
MaxPERF Technology applied - Offshore Europe
Date: (Tuesday, June 30, 2009)
……April 2009. SMAPE S. R. L. (a coiled tubing, N2 & pumping services company located in Italy) and PENETRATORS CANADA INC. are pleased to announce the first successful MaxPERF®  job performed in continental Europe. The job was carried out with the cooperative efforts of SMAPE ... read more!

MaxPERF Drilling Tool - ideal tunnels for frac initiation in tight, highly stressed formations
Devon Canada Corp. utilized the MaxPERF Drilling Tool in a few tight and high stress formations that have been difficult to initiate sand fracture treatments.  Dwayne West, Business Development Manager with Penetrators recalls early discussions with Devon personnel.  “The larger diameter ... read more!

Baldonnel Completion in NE B. C. - Conventional Completion vs. MaxPERF Completion
11-31 Well  (CONVENTIONAL COMPLETION) No inflow after perforating the Baldonnel under balanced with tubing conveyed perforating gun.  Performed three 15% acid squeezes - total acid volume equals 6m3.  The well subsequently flow tested @ 9.0E3m3/D @ 1800 kPa.  Performed a ... read more!

Central Alberta re-completion of a Glauconite oil zone after a water shut-off cement squeeze
A Glauconite oil formation was remedially cement squeezed in an effort to shut off excessive water production.  After re-perforating the upper portion of the productive interval, no inflow was tested. The operator then used MaxPERF technology to drill five tunnels into the same upper portion ... read more!

Compare a perf/frac completion to a MaxPERF completion in the Bakken formation
Renegade Oil & Gas Ltd. has used the MaxPERF Drilling Tool in numerous formations in SE Saskatchewan.  When a Bakken completion was scheduled, Renegade personnel felt that a frac stimulation was risky due to a close water contact on logs.  Eight MaxPERF penetrations were completed in ... read more!

Close water contact and fines migration plugging near-wellbore area call for a MaxPERF Completion
A General Petroleum sandstone play continually had near wellbore plugging issues and sand related pump problems; this operator decided to complete this GP sandstone well with eight MaxPERF tunnels using light oil as the operating fluid. The initial inflow test was very good and the well ... read more!